Close Menu
Golf Business TechnologyGolf Business Technology
  • Business News
  • Technology News
  • Media Hub
    • Videos
    • Webinars
    • Podcasts
  • Insights
    • Features
    • Opinion
  • Membership
  • Member Account / Login
  • Partners
  • PGA Show
  • About Us
  • Contact Us
  • Email Newsletters
  • Media Pack
  • Job Board
LinkedIn X (Twitter) Instagram
  • FREE Email Newsletters
  • About Us
  • Contact Us
  • Media Pack
  • Member Account / Login
LinkedIn X (Twitter) Instagram
Golf Business TechnologyGolf Business Technology
  • Business
        • Appointments
        • Course Management
        • Drone Solutions
        • Event Management
        • Golf Architecture
        • Golf Club
        • Golf Machinery
        • Golf Resorts
        • Golf Sponsorship
        • Industry News
        • Investment & Mergers
        • Irrigation Systems
        • Sports News
        • Sustainability
        • Turf Management
  • Technology
        • Artificial Intelligence
        • Augmented Reality
        • Autonomous
        • Booking Software
        • Clothing & Footwear
        • Club Management Software
        • Coaching / Training
        • Data & Analytics
        • Driving Range
        • Golf Course
        • Golf Entertainment
        • Golf Equipment
        • GPS software
        • Home Simulators
        • Indoor Golf
        • Launch Monitor
        • Rangefinders
        • Shot Tracking
        • Swing Aids
        • Virtual Golf
        • Wearables
  • Media Hub
    • Videos
    • Podcasts
    • Webinars
  • Insights
    • Features
    • Opinion
  • Membership
  • Partners
  • PGA Show
  • Job Board
LinkedIn X (Twitter) Instagram
Golf Business TechnologyGolf Business Technology
Home»Business»Industry News»Crowborough Beacon Continues Investment with Major Course and Facility Upgrades
Industry News

Crowborough Beacon Continues Investment with Major Course and Facility Upgrades

Jane TurnerBy Jane TurnerMay 21, 2026No Comments3 Mins Read
Twitter LinkedIn Facebook Email
New fleet at Crowborough Beacon
New fleet at Crowborough Beacon
Share
LinkedIn Twitter Facebook Email

Crowborough Beacon Golf Club has reinforced its commitment to continual improvement with a significant programme of investment across course conditioning, infrastructure and member facilities as the 2026 season gathers pace.

Following recent improvements both on and off the course, the East Sussex club has introduced a new fleet of greenkeeping equipment as part of a six-figure investment to elevate playing conditions across the course. This is complemented by a long-term pathway programme, a new halfway house and upgrades to the terrace.

The new machinery includes a full suite of John Deere equipment including hybrid fairway mowers, walk-behind and hybrid triplex mowers, a rough mower and new sprayer for fertiliser and plant protection applications.

Additional operational equipment includes utility vehicles, a compact loader and an excavator, providing greater flexibility for ongoing maintenance and development work.

Alongside machinery investment, the club continues work on a multi-year pathway development programme launched in 2025.

The initiative is funded through the club’s Festival of Golf, which raised £21,000 in its first year. Proceeds from the six-day event are being reinvested into pathway construction, with the long-term aim of upgrading walkways across the course.

Working with Eco-Surfaces, the club has introduced a rubber mulch pathway system designed to provide improved year-round access while complementing the heathland landscape. The project also includes training for the club’s in-house team to support future installation work.

Following completion of a 660sqm pathway network linking the first hole, putting green and clubhouse approach in 2025, the next phase is scheduled for installation this year.

More than 600sqm of new pathways will be constructed around the sixth and seventh holes, and will also include landscaping, drainage improvements, heather planting and new grassed areas.

Further investment has been made in off-course facilities, with a new halfway house nearing completion. Positioned to serve the tenth, 12th and 14th holes, the building will include toilet facilities and provision for future food and beverage service.

An upgrade to the clubhouse terrace will introduce new outdoor furniture, while a separate £40,000 infrastructure project has replaced two condemned bridges with a new culvert, alongside associated landscaping work.

Club secretary Chris Dowrick said: “These investments reflect our ongoing focus on improving the course and facilities. From maintenance equipment to infrastructure upgrades, these projects are designed to improve playing conditions and the overall experience at Crowborough Beacon.

“The support from our members, particularly through the Festival of Golf, has helped us move forward with these projects, and we look forward to seeing the benefits over the coming seasons.”

Further developments are planned as part of the club’s long-term improvement programme.

Share. LinkedIn Twitter Facebook Email
Jane Turner

Jane Turner is the Editor of Golf Business Technology and has worked in the Education and Consulting sector for over two decades.

Related Posts

Rolex Testimonees Savour the Scenery and Friendship at the Amundi Evian Championship

July 23, 2026

Celtic Manor and Zen Golf Build New Model For Golf Participation, Performance and Wellbeing

July 23, 2026

ZEN Golf and Karl Morris Announce Partnership Inspired by Ryan Fox’s Open Championship Success

July 23, 2026
Add A Comment
PGA Show 2026
FREE EMAIL NEWSLETTERS

Get exclusive access to breaking news, opinion editorials and Golf content


Golf Business Technology
LinkedIn X (Twitter) Instagram
  • Privacy Policy
  • Cookie Policy
  • Terms and Conditions
© 2024 Golf Business Technology Ltd, Northern Ireland, Company No. NI677833 All rights reserved

Type above and press Enter to search. Press Esc to cancel.